CBS Studio Center Parking Structure

CBS Studio Center Parking Structure

Studio City, California

CLIENT:
CBS Studio Center

DESCRIPTION:
1200 car parking structure on a studio lot, designed for efficiency and to satisfy concerns of adjacent residents.

Completed while at Project Manager at another firm.

Engineering Laboratories Replacement

Engineering Laboratories Replacement

California State Polytechnic University, California

CLIENT:
California State Polytechnic University

DESCRIPTION:
Concept Design through Design Development services phase for a new two story 105,000 square foot Engineering Laboratory building.

Completed while at EHRLICH-ROMINGER.

UPS Sort and Load Facility

UPS Sort and Load Facility

Long Beach, California

CLIENT:
United Parcel Service

DESCRIPTION:
United Parcel Service mail and sorting facility and aircraft ramp on the southeast side of Long Beach Airport. The project site is 8.2 acres with a 6,000 square foot sort recovery building, 5,200 square foot administrative building and aircraft ramp for three B737-400 aircraft.

Completed while at HMTB Company.

 

Plant 42, Hangar 51 Renovation

Plant 42, Hangar 51 Renovation

Palmdale, California

CLIENT:
Northrop Grumman

DESCRIPTION:
Renovation of an existing 250,000 square feet maintenance hangar with offices and shop facilities for use in making modifications to B-2 Bombers.

Completed while at Sverdrup Facilities.

 

Confidential Studio Parking Structure

CONFIDENTIAL STUDIO PARKING STRUCTURE

California

CLIENT:
Confidential

DESCRIPTION:
An approximate 500 car parking structure with a 20’ clear grip and lighting warehouse with potential for possible basement level.

Completed with Parking Design Solutions, a GAA joint venture.