Chino Hills Business Center

Chino Hills Business Center

Chino Hills, California

CLIENT:
Investment Development Services / Kendrick Construction Services

DESCRIPTION:
Five one-story multi-tenant industrial buildings totaling approximately 111,000 square feet. Truck doors accommodate service in the rear.

Arrow Recovery Group

Arrow Recovery Group

Fontana, California

CLIENT:
Xebec Building Company

DESCRIPTION:
This two building complex totaling approximately 74,000 square feet posed unique challenges to overcome. The site required GAA to come up with innovative solutions in order to accommodate all the requirements for trucking, parking, and equipment, and the high-hazard nature of the facility required a high degree of knowledge and skill to create an efficient and viable design.

This facility provides administrative offices as well as e-waste recycling and gold refining plant which required H2, H3, H4, F1, S, and B occupancies.

Xebec Vernon Industrial Complex

Xebec Vernon Industrial Complex

Vernon, California

CLIENT:
Xebec Realty Partners

DESCRIPTION:
A two-building master plan totaling over 500,000 square feet, including a 200,00 square feet, 32' clear height speculative shell building and a 36' and 55' clear height 300,000 square feet plastic bottle recycling and manufacturing plant build-to-suit for rPlanet Earth.

Manufacturing plant features 40,000 Amps of power, 10 air changes per hour, H3 storage, two bridge cranes, equipment and silo foundations, and a three-level office.

Hyde Park FedEx DGO Facility

hyde park fedex dgo facility

Inglewood, California

CLIENT:
Panattoni Development Company, Inc

DESCRIPTION:
The project consists of a 143,600 square feet building that includes a 9,300 square feet office/ship center tenant improvement, 2,700 square feet vehicle maintenance, and a 131,600 square feet sort/freight area serving 108 drive-in van positions.  The building also features a 32' clear height and a 400k/500kVA generator.

Building girders and dock panels designed to allow conversion to a typical distribution use in the future.

Mira Loma Business Park, Lot 37

Mira Loma Business Park, Lot 37

Jurupa Valley, California

CLIENT:
JV Commerce Center Partners, LP

DESCRIPTION:
Part of the Mira Loma Commerce Center, this 97,000 square feet, 6-building project responds to the adjacent residential neighborhood by setting buildings back and providing central truck access.

Layout provides private yards for each tenant.

Puerto Logistico Aeropuerto Los Cabos

Puerto Logistico Aeropuerto Los Cabos

Los Cabos, Mexico

CLIENT:
BP-Rio Development Company

DESCRIPTION:
Logistics Distribution Center on 35 acres adjacent to Los Cabos International Airport. Total building area of approximately 650,000 square feet.

Mira Loma Business Park, Lots 38 & 39

Mira Loma Business Park, Lots 38 & 39

Jurupa Valley, California

CLIENT:
JV Commerce Center Partners, LP

DESCRIPTION:
Part of the Mira Loma Commerce Center, this 144,000 square feet, 6-building project was designed to incorporate into the existing industrial park and to communicate architecturally with the neighboring Lot 37.

Features private yards for each building and a central truck drive to respond to the adjacent residential neighborhood.

Colton Distribution Center

COLTON DISTRIBUTION CENTER

Colton, California

CLIENT:
Shubin & Nadal Realty Investors

DESCRIPTION:
Two speculative industrial buildings built on a 21.24 acre site. Building 1 has an approximate parcel area of 693,079 SF. The total ground floor building area splits at approximately 2300 SF office and 178,000 SF warehouse, while the total gross floor area for mezzanine measures at about 2500 SF.

Building 2 has an approximate parcel area of 232,319 SF. The total ground floor building area splits at approximately 1800 SF office and 43,000 SF warehouse, while the total gross floor area for mezzanine measures at about 2000 SF.